Besides, the Federal Government, a major stakeholder in the 3.2billion barrels recovery project, has through the Nigerian National Petroleum Corporation (NNPC), been demanding “high level of local content on the integration work needed for the planned Floating Production Storage and Offloading (FPSO) vessels
Read more @ New Telegraph
No comments:
Post a Comment